Project Portfolio

NAC Tower

Blk 2 Lot 2 City Center, Bonifacio Global City, Taguig City
                          image
Appointment Scope:
Appointed Mechanical Contractor from May 2011 to March 2013
Contract Amount:
Php31.9M
Projects Brief:
A 34-storey building consisting of 5 basement parking levels and 7
podium parking levels to secure tenant parking spaces with a ground
floor level that will consist of retail areas that will cater the tenants.
The superstructure will consist of 22 floors of rentable office spaces
at 1,039 square meter gross area for each floor which is suitable for
call centers and other business offices.

Mercedes Hotel

Kalayaan cor. Makati Aves., Makati City
                          image
Appointment Scope:
Appointed to perform Mechanical Works - Supply & Installation of
prefabricated ducts and Aircon units mlom Nov 2009 to May 2012
Contract Amount:
Php8.2M
Projects Brief:
The Mercedes Building Project is a hotel building located at the corner of Kalayaan Ave and Makati Ave, Makati City. The project has an approximate GFA of 25,000 sq.m. with thirty two (32) floors plus a roof deck and three (3) basements floors. The project also consists of five (5) podium parking floors, eighteen (18) hotel floors and multiple floors for various function areas. The project is equipped with the regular amenities of a luxury hotel such as coffee shops, restaurants, spa/gym and a swimming pool.

EDSA Shangri-la Hotel

EDSA cor. Shaw Blvd., Mandaluyong City
                          image
Scope of Contract:
Performed various Mechanical, Electrical, Plumbing, Fire Protection,
Civil and Architectural Works mlom June 2006 to September 2009
Contract Amount:
Php59.6M
Projects Undertaken:
-Various MEPF works at Chi Spa
-Various MEPF works at Chi Academy
-Electrical works for Back of the House main Kitchen Renovation
-Supply and installation of Electrical Devices for heat podium
-MEPF works at Horizon Service & Stairwell areas
-Main Kitchen renovation

Makati Shangri-la Hotel

Ayala cor. Makati Aves., Makati City
                          image
Scope of Contract:
Performed various Mechanical, Electrical, Plumbing, Fire Protection,
Civil and Architectural Works mlom January 2006 to September 2009
Contract Amount:
Php73.4M
Projects Undertaken:
-Various MEPF works at Inagiku
-Generator System upgrade
-MEPF works for P-Function Rooms
-Installation of additional panel boards at Inagiku
-Installation of Feeder Line
-Alternate Supply Pipe for Fire Hose Cabinets
-SLM and Supervision for the re-painting room exhaust duct up to last 3 roofdeck area
-Various MEPF works at Grand Ballroom, Guest Rooms and Function Rooms

South Luzon Tollway Corporation

EDSA cor. Shaw Blvd., Mandaluyong City
                          image
Scope of Contract:
Performed the Supply and Installation of Air-Conditioning Units in
Toll Plazas of South Luzon Expressway (SLEX), thru MTD Construction
Phils., Inc, mlom March 2009 to June 2010
Contract Amount:
Php57M
Projects Brief:
The SLEX Project is a joint venture undertaking of the PNCC and MTD Manila Expressway Corporation. The project involves the rehabilitation of the Alabang Viaduct (Toll Road 1) in Muntinlupa City; the widening and rehabilitation of lanes mlom Alabang to Calamba, Laguna (Toll Road 2); the extension of the road mlom Calamba to Sto. Tomas, Batangas (Toll Road 3).

Manila International Airport Authority

Paranaque City, Philippines
                          image
Scope of Contract:
Performed the Supply and Installation of prefabricated Ducting
Systems and Aircondition Works
Contract Amount:
Php30M
Projects Brief:
The project is the construction of the new IPT3 at NAIA. It will accommodate the growing volume of international air traffic to Manila, which has exceeded the current capacity of the airport. The new terminal is adjacent to the existing airport facilities on land within the former Philippine Air Force Base at Villamor. With nearly 200,000 m2 of floor space, IPT3 will handle up to 13 million international passengers a year, with a duty mlee shopping complex forming an integral part of the terminal.

Wyeth Philippines, Inc.(Evergreen Contract)

Cabuyao, Laguna
                          image
Scope of Contract:
Performed various Mechanical, HVAC Works, Cleanroom Testing and
Construction
Contract Amount:
Php87M
Project Udertaken:
- Design & Installation of A/C System for Admin Extension
- Proposed Existing 2nd Floor Admin Office Rehabilitation
- HVAC Works in Canning Area
- Piping Works for 200TR Chiller
- Fire Protection and HVAC Works at Nutri-Office
- Supply & Installation of Works for A/C system of ESAK Bldg.
- Supply & Installation of ACU for Niro & Elevator Machine Room
- Airconditioning Works at Building Nos. 4,5 & 6
- Electrical Works at Brookline 2 Warehouse aircon system
- HVAC Works at Plant No. 2

Nestle Philippines, Inc.(Evergreen Contract)

Cabuyao, Laguna / Cagayan de Oro, Misamis Oriental
                          image
Scope of Contract:
Performed various Mechanical and Airconditioning Works
Contract Amount:
Php60M
Projects Undertaken:
- Supply & Installation of AHU Piping at Cabuyao Plant
- Renovation of Main QA Laboratory
- Cold Storage Room
- Installation of AHU Fabrication of S/S Duct at Big Bag
- AC Ductworks @ Logistics Bldg.
- Installation of 3 star hygienic AHU-MR2 Dry Tipping
- Fan Coil Units @ Proposed MDWT Offices
- SLM: S/S spiral duct at Cabuyao and Cagayan de Oro Plants

Integrated Micro-electronics, Inc. (IMI)(Evergreen Contract)

Laguna Technopark, Binan, Laguna
                          image
Scope of Contract:
Performed the General Construction of various production lines and
facilities, and various MEPF works
Contract Amount:
Php78M (approx.)
Projects Undertaken:
- SLM: Repiping of DI Water & CDA Line
- Civil Works at Building B for Hitachi Phils., Inc.
- Testing & Air Balancing for Airconditioning System @ Slider Fab.
- Various Civil Works at Panak Project
- Various Mechanical works for Panasonic project
- Supply & Installation of Chilled Water System
- Supply and Installation of Sprinkler System
- Various Civil and Mechanical Works for Bosch Facility
- Mechanical, Civil & Architectural Works at Trixell project
- Civil and Mechanical works for Mold Transfer

Vitalo Packaging (Phils.), Inc.(Evergreen Contract)

Laguna Technopark, Binan, Laguna
                          image
Scope of Contract:
Performed the General Construction of new production facility and
the Design and Construction of Cleanroom
Contract Amount:
Php60M
Projects Undertaken:
- SLM: Cleanroom Expansion at LIIP Plant
- SLM: Dry-type Transformer
- Reinstallation of remligerant Piping
- Transfer of Facility (MEPF, Civil and Cleanroom Works)
- SLM: Fire alarm and detection system

Transitions Optical Phils., Inc..(Evergreen Contract)

Laguna International Industrial Park, Mamplasan, Binan, Laguna
                          image
Scope of Contract:
Performed the General Construction of new production facility and
Design & Construction of Cleanrooms
Contract Amount:
Php15M
Projects Undertaken:
- SLM: Various Electrical works & CDA for Machine Equipment
- MEPF Works for Line 2 Expansion and IR Oven
- Various Facility Relocation Works
- Duct and aircon works and SLM of PassBoxes
- Relocation and Construction of PME Workshop
- Mechanical Works at Engineering and Mixing Labs
- Office Renovation Works

EMS Components Assembly, Inc.(Evergreen Contract)

Laguna Technopark, Binan, Laguna
                          image
Appointment Scope:
Performed various Mechanical, Electrical and Architectural Works
Contract Amount:
Php25M
Projects Undertaken:
- SLM: Various Electrical works at Facility Expansion
- Mechanical, Electrical and Civil Works at Office Expansion
- Civil, Mechanical and Electrical Works at Production Line
Facility Expansion
- Mechanical Works of Expansion Building
- SLM: Additional Exhaust at Production Area
- Fabrication and Installation of Trusses and Roofing System
- Modification Works of Plant No. 3